Telephone: +44 (0)1952 588884

Welcome to AllGlass Systems Limited EST.1985

Bengal Street ManchesterView Study

New Build - Aluminium Windows, Doors and Curtain Walling

Bengal Street, Manchester is a domestic new build comprising of 40+ apartments and a number of commercial offices to the ground floor.

Bengal Street Case Study

EON KingswinfordView Study

Replacement of all External Windows

EON contacted AllGlass Systems when they needed to completely replace all external windows on their main office block. AllGlass Systems Limited acted as principle contractor throughout the works.

EON Case Study

Charlotte Court ChesterView Study

Aluminium Vertical Sliding Windows (Residential)

Charlotte Court is comprised of 63 residential apartments located in the centre of Chester. AllGlass Systems provided the windows for the project.

Charlotte Court Case Study

Coleshill House ColeshillView Study

Glazing and Doors

Coleshill House is a commercial development. AllGlass Systems provided the glazing and doors for the development.

Coleshill House Case Study

Budgen Motors ShrewsburyView Study

Commercial Glass to Glass Screen Work and Automatic Doors

Budgen Motors required refurbishment to their existing car showroom in Shrewsbury. AllGlass Systems provided the aluminium screen work, main entrance doors and hand-over bi-fold doors.

Budgen Motors Case Study

Horsehay Methodist Church TelfordView Study

Replacement of Existing Steel Single Glazed Windows

AllGlass Systems was involved in the replacement of the existing steel single glazed windows with new thermally broken, double glazed, aluminium casement windows.

Horsehay Methodist Church Case Study

Clive Primary School ShropshireView Study

Supply and Fit New Aluminium Windows, Doors and Screen-work

AllGlass Systems was contracted to supply and fit new aluminium windows, doors and screen-work to a new build extension of Clive Primary School. The main entrance door and inner vestibule door were automated by AGS.

Clive Primary School Case Study

Lindon Hall Surgery NewportView Study

Doors and Glazed Vestibule

AllGlass Systems installed a UPVC glazed roof system that formed the vestibule area of the building.

Lindon Hall Surgery Case Study

Birmingham University- Medical School BirminghamView Study

Installation of a Roof Vent into Existing Sky Light

Birmingham University's Medical School required the installation of a tailor-made roof vent into an existing sky light for ventilation. The roof vent needed to be operated by a double worm gear and pole operated internally.

Birmingham University- Medical School Case Study